How to configure 300 tonnes per hour manganese ore crushing production line
Configuration plan of 300 ton per hour manganese ore crushing line:
Feed: manganese ore, below 600mm
Finished product: 0-20mm
Output: 300 tonnes per hour
Equipment Configuration: One PE750*1060 Jaw Crusher, three CS160 Cone Crushers.

Manganese ore crushing main equipment introduction:
1、Jaw crusher:
Jaw crusher is a high-efficiency coarse crushing equipment, features include high-efficiency crushing chamber, combined frame, integrated motor, no-floor foot elastic support, as well as hydraulic adjustment and full-automatic lubrication system, these features ensure stable and reliable operation of the equipment, is the choice of coarse crushing operations.
2、Cone Crusher:
Cone crusher, specially designed for medium and fine crushing operation, is famous for its laminated crushing technology, which ensures superior grain shape of the finished material. Its wear parts are made of high wear-resistant materials, which significantly extends the service life and reduces the production cost. At the same time, the equipment is highly intelligent, easy to operate and stable in operation.
-