Indonesia 450 tons per hour construction aggregate production line
The unit modular structural component installation method is adopted
The Indonesia 450 tons per hour construction aggregate production line project is located in Indonesia. It is a system that mainly produces sand and gravel aggregates for construction. The project is jointly implemented by our company and Singapore T Company for process design, equipment manufacturing, system installation and commissioning, system training and delivery. In order to improve the system installation efficiency and save investment costs, the system adopts the unit modular structural component installation method.
Process advantage description:
1. Cooperate with international companies to design, refer to international standards, and make adaptability improvements to the local environment;

2. In order to save costs, the currently popular modular design and manufacturing method is adopted, which is convenient and fast, and easy to transport.
Processing materials: granite
Production capacity: 450t/h for finished products below 25mm.
Contractor: Luoyang Dahua / Singapore T Company
-