Home > ShowRoom > Zijin Mining 600,000 tonnes per year crushing system construction programme completed by Liming
Zijin Mining 600,000 tonnes per year crushing system construction programme completed by Liming

Zijin Mining 600,000 tonnes per year crushing system construction programme completed by Liming

Project Summary:Project scale: Crushing system 600,000 tonnes/yearProcessed material: lithium mica oreFinished product size: -3mm P80Equipment Configuration: Four Combination Mobile Plant + Impact Crusher Mobile
Send Inquiry
Product Details

Project Summary:


Project scale: Crushing system 600,000 tonnes/year

Processed material: lithium mica ore

Finished product size: -3mm P80

Equipment Configuration: Four Combination Mobile Plant + Impact Crusher Mobile Plant + Vibrating Screen Mobile Plant


Use of finished material: grinding → magnetic separation → re-election

Liming Group's mobile crushing plant series are specially crafted for the metal mining field. These plants are not only highly adaptable, but also meet customers' needs for diversified products, high quality and high production capacity on site. Liming Group always adheres to the concept of providing customers with all-round, systematic and integrated solutions, and is committed to assisting the continuous development and optimisation of the mining industry. With advanced technology and professional services, Liming Group has won wide recognition in the industry.



Advantages in mining projects:


Short cycle time, quick return

Liming crushing mobile plant is designed for short construction period and urgent material projects. Its integrated body eliminates the need for tedious infrastructure construction and rapid deployment, effectively reducing investment costs. Whether it is a construction, road or mineral project, it can respond quickly to ensure efficient project progress.


Flexible and mobile

Liming Group's mobile crushing plant integrated unit is flexible, occupies a small area and is easy to operate. With strong adaptability, it can be quickly transferred to different operating environments and quickly put into production, which greatly improves the efficiency of the project, making it an ideal choice for modern crushing operations.

Advanced technology, reliable equipment

The main equipment adopts advanced hydraulic control technology and mature technology, so that the overall production technology and process equipment are at the advanced level at home and abroad, ensuring the efficient and stable operation of the whole project.


Various models, wide range of application

Liming mobile crushing plant can be adapted to equipment switching to meet customers' various individual needs.