80TPH Spodumene Graphite Beneficiation Plant Rwanda
**Keywords**: 80tph spodumene graphite processing plant Rwanda, mica spodumene graphite beneficiation, spodumene graphite flotation equipment
This 80TPH spodumene graphite beneficiation plant in Rwanda targets mica-rich pegmatite ore. Muscovite mica is naturally floatable, which contaminates graphite concentrate and downgrades graphite purity. The original plant had graphite concentrate fixed carbon only 81%, below battery anode buyer’s requirement.

Our full process design: pre-screening to remove liberated coarse mica → C6X jaw primary crushing → HST cone closed-circuit crushing → high-frequency screen → ball mill grinding → flotation circuit. The pre-screen works at 6 mm cut size, removing free mica flakes before fine crushing. In flotation, we use staged flotation: first recover graphite, then float spodumene, with mica depressant added in lithium flotation tank.
After optimisation, the pre-screen removes 33% of total muscovite ahead of main circuit. Final graphite concentrate fixed carbon reaches 94.5%, spodumene concentrate Li₂O 6.02%. The mine reduced depressant dosage and stabilised product quality. The plant runs 2 shifts daily, our after-sales team provides quarterly inspection and spare part supply.
### FAQ
Q1: What is the main impurity affecting spodumene graphite in Rwanda pegmatite?
A1: Muscovite mica is the top issue. It floats easily and contaminates both graphite and spodumene concentrates.
Q2: Can we remove all mica only by pre-screening?
A2: No. Locked mica inside spodumene-graphite grains can only be suppressed by flotation reagents. Pre-screening cuts most coarse liberated mica load.
Q3: What is the payback period for this 80TPH plant?
A3: Based on local concentrate price and operating cost, the calculated payback is about 2.4 years.